The Griffith Park Pool Is Still Years Away. Here's Where Los Feliz Swims This Fall.

October 8, 2026

Where does a Los Feliz lap swimmer go on a weekday morning in October 2026? For most of this month the short answer is Glassell Pool on Verdugo Road. Two of the other heated, year-round city pools on this side of town are closed for maintenance until late October and early November.

The pool closest to the neighborhood has been out for much longer. The Griffith Park Pool at Riverside Drive and Los Feliz Boulevard dates to 1927. It closed during the pandemic in early 2020, and when city workers tried to refill it, they found it no longer held water. That pool was seasonal. The replacement now in design is planned as a year-round 50-meter pool. So the fall shutdown elsewhere in the city is the exact gap the new pool would fill, if it gets built on the schedule the city has published.

The Fall 2026 Swim Calendar, Date by Date

These are the dates the operators have posted, in the order they matter:

  1. Now through October 28: Glassell Pool, 3704 Verdugo Road. The city lists it as open and heated, and its facility page calls it a year-round outdoor pool. The fall brochure runs September 7 through December 31. It lists lap swim Tuesday through Friday from 6 to 8 a.m., lap and recreation swim on weekday afternoons, evenings and weekends, and fall group lessons for both youth and adults.
  2. October 29: Echo Park Indoor Pool reopens, 1419 Colton Street. This is the heated indoor pool many swimmers call Echo Deep. Its fall brochure lists an annual closure from September 16 through October 28 and a projected reopening on October 29. After that it offers lap swim, recreation swim and lessons.
  3. November 6: Hollywood Pool reopens, 1122 Cole Avenue. This outdoor, heated, year-round pool closed for six weeks starting September 25. The city projects a November 6, 2026 reopening.
  4. December 14 through January 3: watch the West Hollywood calendar. The West Hollywood Aquatic Center at 8750 El Tovar Place is a year-round rooftop facility with separate competition and recreation pools. The city says all are welcome with online registration, and nonresident lap swim is $7.50 a session. Its posted schedule shows full-day closures nearly every day from December 14 through December 30 and again from January 1 through January 3.

Two options outside the city of Los Angeles are not part of these maintenance closures. Glendale's Pacific Community Pool at 509 South Pacific Avenue is advertised as year-round, and its posted schedule for September 28 through October 4, 2026 includes both lap and recreation swim. Its lesson page lists separate resident and nonresident prices, so families from Los Feliz can enroll at the nonresident rate. Burbank's Verdugo Aquatic Facility at 3201 West Verdugo Avenue offers year-round lap swim, with fall and winter lane availability posted from September 14. A single nonresident lap-swim visit costs $9 under fees effective May 25, 2026. Burbank does post holiday closures. The facility is closed November 11, November 26 and 27, December 25 and January 1, and it closes at 1 p.m. on December 24. Burbank's recreational swim season there is closed until summer 2027, so the Verdugo facility only works for lap swimmers right now.

Neither Glendale nor Burbank says on its current pages whether its pool is heated. West Hollywood says only that its water temperature varies with the weather and the time of year. If you're planning a November morning swim, call ahead.

Why the Old Pool Couldn't Cover This Gap Anyway

Even before it started leaking, the Griffith Park Pool couldn't have covered this month. The Los Angeles Times calls the 1927 facility a seasonal pool, and it was a regular spot for children's swim lessons and recreational lap swimmers. Councilmember Nithya Raman's office tells a slightly different version. Its parks page says the pool was set to reopen in 2022 when the city found it could no longer hold water.

The plan changes what the site is for. Schematic drawings shown to residents in March describe a new year-round competition pool, 50 meters long and 25 yards wide, ranging from 3 feet 6 inches to 12 feet 9 inches deep. Next to it, the drawings show a 25-yard by 50-foot training pool that slopes gently down to about 4 feet to meet ADA requirements. A longtime area resident put it in one line at that meeting: "We're very anxious to have the school come back, so that the kids can learn to swim."

Three Official Versions of the Same Pool

The replacement is described in three public places, and they don't agree with each other.

Source Cost Second pool Schedule
City and design-firm handout reported by the LA Times, March 20, 2026 About $40 million 25-yard by 50-foot training pool Completion around July 2029
Bureau of Engineering project record, work order E1909103 $36 million estimate 25-yard by 25-yard splash pad Construction March 1, 2028 to August 31, 2029
Council District 4 parks page, updated September 16, 2026 $2.4 million for design, plus $5.35 million in the FY24-25 budget Not specified 14 months of design from fall 2025, 6 months bid and award, 24 months construction

Cost. The gap between $36 million and $40 million may come down to what each figure counts. The Bureau of Engineering lists an estimated cost, and the Times reported the total project figure. The direction of travel is clearer. Early in planning, the Bureau of Engineering forecast construction costs of $28 million. City officials told residents the site is complicated by Interstate 5, which was routed just east of the pool in 1964, and by the Los Angeles River.

Funding. The council office's page lists $7.75 million in total, $2.4 million for design and $5.35 million in the FY24-25 budget, and describes it as part of a multi-year commitment. Against a $36 million to $40 million estimate, that leaves most of the money still to be identified in public. The Bureau of Engineering record still lists the project in design with no contractor selected. The October 1, 2026 Recreation and Park Commissioners agenda has no Griffith Park Pool item.

The second pool. For families, a shallow training pool and a splash pad are very different things to have next to a lap pool. The March drawings showed the first, and the engineering record's scope still describes the second. At the March meeting, Perkins Eastman principal Stephanie Kingsnorth said the project was nearing the end of design development, "with many details still under discussion."

Schedule. All three sources land somewhere in 2029. The handout breaks it down as roughly six months for construction documents, five for permits, five to choose a contractor, eighteen for construction and six for close-out. The council office's 24-month construction estimate is six months longer than the 18 months between the engineering record's start and end dates. Kingsnorth called the timeline "ambitious."

What the Site Gains Besides Water

Most of the coverage focuses on the pools, but several parts of the plan change how the corner works day to day:

  • An ADA path from the bus stop. The engineering scope includes an accessible path from the bus stop at Los Feliz Boulevard and Riverside Drive to the existing playground and pool. Households in Los Feliz who get around with fewer car trips, a pattern covered in our car-light Los Feliz guide, will feel this more than anything else on the list.
  • A pool house with the same face and a new interior. The two-story Spanish Colonial Revival building keeps its red tile roof and wooden trellises on the outside. Inside, it gets an elevator, a second stairway and a structural retrofit.
  • Private changing rooms. The open-air men's and women's changing areas become one indoor gender-neutral area. Kingsnorth said "every single toilet room and dressing room is an individual room." The outdoor showers will be rinse-only.
  • Spectator seating and a diving board. The plan includes three rows of shaded concrete bleachers along the competition pool. Maha Yateem, the city's principal recreation supervisor for citywide aquatics, said the pool will have a diving board and that its location is still being worked out.

The bleachers and a 50-meter competition pool point toward meets and team use, along with lessons and lap swim. When construction starts, the corner of Riverside and Los Feliz Boulevard will also be an active work site for a year and a half or more. Residents raised the effects of construction as one of their main questions in March. The council office asked that questions and comments go to [email protected]. For more on how the blocks nearest the park differ from each other, see our guide to Los Feliz pocket areas near Griffith Park.

For the rest of this fall, the routine is simpler than the rebuild. Swim at Glassell through October 28, go back to Echo Park Indoor Pool on October 29 and Hollywood Pool on November 6, and use Glendale or Burbank as a backup once the West Hollywood closures start in mid-December, after checking Burbank's holiday dates.

If you own near Riverside Drive and want to know how an active city construction schedule down the street should factor into the timing of a sale, a lease or a renovation, Richard Evanns reads the public project records the same way he reads a contract. Schedule a strategy call and we'll go through the Griffith Park Pool timeline against your own.